factory acceptance test Options
2. Scope: Publish the scope of this protocol as “this protocol is relevant for the equipment produced by ABC Ltd.”Okay, the last action is to test the analog output card. The testing system here is really just like what we did to the electronic output card.For the duration of this step, always make sure to hold the traces of communication open